Client: NHS - New Fife Acute Hospital Kirkcaldy Fife
click images to enlarge
Our role on this project was to peer review and comment on outline design drawings for the project compiled by Hulley and Kirkwood consultants.
We produced the master 3D fully co-ordination drawings using MEP+ software for all M&E services including Biomass and CHP equipment located in Energy Centre.
All plant areas are currently being drawn and fully co-ordinated in 3D to allow modules where feasible for general pre-fabrication of Pipe work, valve sets etc. Plant areas being the Service route from energy centre to building entry at basement entrance, incorporating underpass below road, basement corridor and the main energy centre.