Case Study: Anaerobic Digestion Plant

Client: Confidential
Location: Lanarkshire, Scotland
Proposed Completion Date: December 2010

The first of its kind to be built in the UK

anaerobic digestion plant anaerobic digestion plantanaerobic digestion plant

click images to enlarge

The Project:

  • Modern organics recycling facility, capable of treating a variety of food waste.
  • Enable facility to receive 30,000 tonnes of food waste to be recycled per annum.
  • Produce and sell 15,000 tonnes of pod and liquid fertilizer/compost.
  • Export 2,4MW of electricity to the national grid.

Our Scope:

  • Carry out Construction Design and Management (CDM) on the entire project from commencement of design to construction completion.
  • Compile all tender documentation, vendor assessments and contractor appointments.
  • Identify Health and Safety risks in respect to Construction Design and Management Regulations (CDM 2007).
  • Undertaking full detail electrical design of project including control philosophy.

View all case studies ยป